Material Calculators
Paver Patios
Patio Calculator
Calculate dense base or clear base, plus bedding material for paver installs.
Patio Recommended Order
Base Needed
Bedding Needed
Retaining Walls
Wall Calculator
Calculate dense or clear base for the wall footing and 3/4" clear limestone backfill behind the wall.
Wall Recommended Order
Wall Base Needed
Backfill Stone Needed
Material Summary
Estimates are approximate. Always account for compaction, waste, over-excavation, unsuitable soils, drainage requirements, geogrid zones, block embedment, access, and supplier-specific material weights. Current assumptions: Dense Base/Class 5 = 1.55 tons/CY, 3/4" Clear Limestone = 1.35 tons/CY, 1/4" Trap Chips = 1.40 tons/CY, Washed Sand = 1.35 tons/CY. Recommended allowances: Dense Base = 15%, Clear Limestone = 7%, Trap Chips = 5%, Washed Sand = 5%.